Total Submitted
47
↑ +3 this weekPending with Madina
12
↓ 2 overdueApproved (Code A)
29
↑ +5 this monthReturned for Revision
6
↓ Action required| Document Title | Doc No. | Revision | Status | Submitted | AI Summary | Actions |
|---|---|---|---|---|---|---|
Inspection Test Plan — Pressure Vessel PV-101 Mechanical | VND-INSP-0009 | Rev 1 | Draft | 11 Mar 202610:30 AST | — | |
Structural Steel Fabrication Drawing — Pipe Rack PR-B2 Structural | VND-STRL-0027 | Rev C | Draft | 11 Mar 202608:05 AST | View AI | |
Method Statement — Hot Tap Procedure Line 22-GG-1800 Structural | VND-PROC-0033 | Rev 0 | Code B — Comments | 07 Mar 202616:10 AST | — | |
Civil Foundation Detail — Compressor Skid CS-07 Civil | VND-CIVL-0011 | Rev 0 | Code C — Returned | 05 Mar 202609:45 AST | View AI | |
Electrical Single Line Diagram — Switchgear Panel SG-04 Electrical | VND-ELEC-0018 | Rev A | Sent to Madina | 09 Mar 202611:20 AST | View AI | |
Piping Isometric Drawing — Line 14-HH-2400-P1 Mechanical | VND-MECH-0042 | Rev B | Code A — Approved | 10 Mar 202614:35 AST | View AI |