
Total Submitted
47
↑ +3 this weekPending with Madina
12
↓ 2 overdueApproved (Code A)
29
↑ +5 this monthReturned for Revision
6
↓ Action required| Document Title | Doc No. | Revision | Status | Submitted | AI Summary | Actions |
|---|---|---|---|---|---|---|
Inspection Test Plan — Pressure Vessel PV-101 Mechanical | VND-INSP-0009 | Rev 1 | Draft | 11 Mar 202610:30 AST | — | |
Structural Steel Fabrication Drawing — Pipe Rack PR-B2 Structural | VND-STRL-0027 | Rev C | Draft | 11 Mar 202608:05 AST | View AI | |
Method Statement — Hot Tap Procedure Line 22-GG-1800 Structural | VND-PROC-0033 | Rev 0 | Code B — Comments | 07 Mar 202616:10 AST | — | |
Civil Foundation Detail — Compressor Skid CS-07 Civil | VND-CIVL-0011 | Rev 0 | Code C — Returned | 05 Mar 202609:45 AST | View AI | |
Electrical Single Line Diagram — Switchgear Panel SG-04 Electrical | VND-ELEC-0018 | Rev A | Sent to Madina | 09 Mar 202611:20 AST | View AI | |
Piping Isometric Drawing — Line 14-HH-2400-P1 Mechanical | VND-MECH-0042 | Rev B | Code A — Approved | 10 Mar 202614:35 AST | View AI |

Total Projects
Total Documents
Pending Review
Approved (Code A)
Returned for Revision
| Document Title | Document No. | Revision | Project | Submitted By | Current Status | Last Updated | Actions |
|---|---|---|---|---|---|---|---|
| Piping Stress Analysis Report | QE-PIP-STR-001 | R02 | Ras Laffan LNG Expansion | Ahmed Al-MansouriVendor | Code A | ||
| Electrical SLD - Substation B | QE-ELE-SLD-045 | R01 | North Field East Phase 2 | James CarterGES | Pending Review | ||
| HVAC Duct Layout - Level 3 | QE-MEC-HVA-012 | R03 | Ras Laffan LNG Expansion | Fatima Al-ThaniVendor | Code B | ||
| Civil Foundation Design Calc | QE-CIV-FND-008 | R01 | Mesaieed Petrochemical | David ChenGES | Revision | ||
| Instrumentation Loop Diagram | QE-INS-LPD-033 | R00 | North Field East Phase 2 | Omar KhalidVendor | Draft | ||
| Structural Steel Shop Drawing | QE-STR-SHD-021 | R02 | Al Khor Gas Processing | Sara NasserMadina | Code A | ||
| Fire Protection P&ID | QE-SAF-FPD-007 | R01 | Ras Laffan LNG Expansion | Michael TorresGES | Pending Review | ||
| Painting & Coating Spec | QE-COR-PCS-015 | R04 | Mesaieed Petrochemical | Noura Al-SulaitiVendor | Code C | ||
| Pipeline Welding Procedure | QE-WLD-WPS-042 | R01 | North Field East Phase 2 | Raj PatelVendor | Pending Review | ||
| Equipment Data Sheet - Pump | QE-MEC-EDS-019 | R02 | Al Khor Gas Processing | Layla HassanMadina | Code A |
Role-specific shortcuts for your most common workflow tasks
Vendor / GESDraft a new IFA/IFC document with title, number, and revision fields.
→Upload documents up to 50MB and get AI-generated summaries with discrepancy detection.
→Route completed documents to the Main Contractor for review and action.
→
No comments yet. Be the first!