Main Contractor Document Review & Routing · Qatar LNG Expansion Phase 3
| Doc Number↕ | Document Title↕ | Originator↕ | Received Date↓ | Revision↕ | Status↕ | Action |
|---|---|---|---|---|---|---|
| QTR-MEC-PID-0041 | P&ID — LNG Feed Gas Compression Train 2 | AM Al-Maha Engineering Vendor | 11 Mar 2026 | Rev B | Awaiting Review | |
| QTR-GES-INS-0018 | Inspection Report — Flare Stack Structural Weld | GS GES QA Team GES | 10 Mar 2026 | Rev A | Under Review | |
| QTR-CIV-DWG-0033 | Civil Foundation Drawing — Slug Catcher Area | DC Delta Contracting Vendor | ⚠ 06 Mar 2026 | Rev C | Overdue | |
| QTR-GES-MS-0027 | Method Statement — Hydrotesting of Process Piping | GS GES QA Team GES | 09 Mar 2026 | Rev 0 | Awaiting Review | |
| QTR-ELE-SLD-0055 | Single Line Diagram — HV Switchgear Room B | GP Gulf Power Systems Vendor | 08 Mar 2026 | Rev A | Reviewed | |
| QTR-GES-QCP-0009 | Quality Control Plan — Fireproofing Application | GS GES QA Team GES | 05 Mar 2026 | Rev B | Returned | |
| QTR-MEC-DWG-0072 | Mechanical Datasheet — LNG Transfer Pump Assembly | AM Al-Maha Engineering Vendor | ⚠ 04 Mar 2026 | Rev 0 | Overdue | |
| QTR-GES-MTO-0014 | Material Take-Off — Instrument Cable Tray System | GS GES QA Team GES | 11 Mar 2026 | Rev A | Under Review | |
| QTR-STR-CAL-0031 | Structural Calculations — Pipe Rack Module 4 | SS Sigma Structures Vendor | 07 Mar 2026 | Rev D | Awaiting Review | |
| QTR-INS-DWG-0088 | Instrument Loop Diagram — Pressure Safety Valves | GP Gulf Power Systems Vendor | 03 Mar 2026 | Rev B | Awaiting Review |
Choose a document from the inbox above to load its content, metadata, and review tools here.
| Timestamp | Actor | Action | Revision | Notes |
|---|---|---|---|---|
| 10 Mar 2026, 09:14 AST2 hours ago | SA Suhas AnandMain Contractor | Routed to QE-LNG for client review | Rev R02 | All technical queries resolved. Transmittal note QTR-LNG-TRN-0041 attached. Routed as per SLA QTR-LNG-SLA-003 within 5 business days. |
| 09 Mar 2026, 16:47 ASTYesterday 4:47 PM | SA Suhas AnandMain Contractor | Routed to GES for technical review | Rev R02 | Requested structural discipline review prior to client submission. |
| 08 Mar 2026, 11:22 AST2 days ago | RK Rajan KulkarniGES | GES review completed — no discrepancies found | Rev R02 | Drawing scale verified, revision block stamped correctly. No comments raised. |
| 07 Mar 2026, 08:55 AST3 days ago | MJ Mohammed Al-JaberVendor | Resubmitted after revision — Rev R02 uploaded | Rev R02 | Addressed all comments from Rev R01 return. Drawing scale corrected, revision block updated per QE-LNG standard. |
| 04 Mar 2026, 14:30 AST6 days ago | SA Suhas AnandMain Contractor | Returned for revision — Rev R02 anticipated | Rev R01 | Returned due to missing drawing scale and unstamped revision block. Next revision number set to R02. Vendor notified via system notification. |
All technical queries resolved. Transmittal note QTR-LNG-TRN-0041 attached. Routed as per SLA QTR-LNG-SLA-003 within 5 business days.
Requested structural discipline review prior to client submission.
Drawing scale verified, revision block stamped correctly. No comments raised.
Addressed all comments from Rev R01 return. Drawing scale corrected, revision block updated per QE-LNG standard.
Returned due to missing drawing scale and unstamped revision block. Next revision number set to R02. Vendor notified via system notification.
No comments yet. Be the first!