
| Document Title | Doc No. | Revision | Status | AI Summary | Submitted (AST) | Actions |
|---|---|---|---|---|---|---|
| Al-Kharsaah — DC Cabling Layout Drawing Rev A | GES-AKS-D-044 | Rev A | Pending Review | — None | ||
| MPC — Cooling Water System P&ID Rev 3 | GES-MPC-P-067 | Rev 3 | Returned | ✦ Ready | ||
| North Field East — Piping Isometric IFA Package | GES-NFE-P-001 | Rev A | Pending Review | ✦ Ready | ||
| Ras Laffan LNG — Structural Inspection Report Rev B | GES-RL-S-014 | Rev B | Code A | ✦ Ready | ||
| Al-Kharsaah Solar — Earthing & Lightning Protection Method Statement | GES-AKS-E-007 | Rev A | Code B | ✦ Ready | ||
| Mesaieed Petrochemical — Pressure Vessel Data Sheet | GES-MPC-V-022 | Rev C | Returned | — None | ||
| NFE Phase 2 — Cathodic Protection Design Report | GES-NFE-CP-003 | Rev A | Draft | — None | ||
| Ras Laffan LNG — Fireproofing Specification Rev A | GES-RL-F-008 | Rev A | Code C | ✦ Ready | ||
| Al-Kharsaah — Tracker Foundation Inspection Checklist | GES-AKS-C-019 | Rev B | Code A | ✦ Ready | ||
| MPC — Flare Stack Structural Drawings IFA | GES-MPC-FL-011 | Rev A | Pending Review | ✦ Ready |
No comments yet. Be the first!