Drag & drop files here or click to browse
(PDF, DWG, XLSX, JPG — max 50MB per file)
AI analysis powered by GPT — results are advisory only.
The submitted document QE-LNG-DOC-0042 Rev. 03 (IFC — Mechanical) has been reviewed by the AI analysis engine against QE-LNG project specifications and standard QA/QC criteria. Compliance score: 72% (6 of 8 critical fields verified). The document metadata is largely complete and meets submission format requirements. However, 5 discrepancies were identified that may result in a Code B or Code C assignment during QE-LNG review. Key concern: the absence of the revision block stamp on the drawing title block is a mandatory requirement per the Dawn-Dashboard Document Control Procedure (DCP-001, Section 4.3). Additionally, a blank signature block at the Madina approval stage suggests the internal review chain may have been bypassed. Recommendation: Address all flagged discrepancies before routing to QE-LNG. Particularly, ensure the XLSX attachment is correctly populated and that all sheet scales conform to the project CAD standards.

Total Projects
Total Documents
Pending Review
Approved (Code A)
Returned for Revision
| Document Title | Document No. | Revision | Project | Submitted By | Current Status | Last Updated | Actions |
|---|---|---|---|---|---|---|---|
| Piping Stress Analysis Report | QE-PIP-STR-001 | R02 | Ras Laffan LNG Expansion | Ahmed Al-MansouriVendor | Code A | ||
| Electrical SLD - Substation B | QE-ELE-SLD-045 | R01 | North Field East Phase 2 | James CarterGES | Pending Review | ||
| HVAC Duct Layout - Level 3 | QE-MEC-HVA-012 | R03 | Ras Laffan LNG Expansion | Fatima Al-ThaniVendor | Code B | ||
| Civil Foundation Design Calc | QE-CIV-FND-008 | R01 | Mesaieed Petrochemical | David ChenGES | Revision | ||
| Instrumentation Loop Diagram | QE-INS-LPD-033 | R00 | North Field East Phase 2 | Omar KhalidVendor | Draft | ||
| Structural Steel Shop Drawing | QE-STR-SHD-021 | R02 | Al Khor Gas Processing | Sara NasserMadina | Code A | ||
| Fire Protection P&ID | QE-SAF-FPD-007 | R01 | Ras Laffan LNG Expansion | Michael TorresGES | Pending Review | ||
| Painting & Coating Spec | QE-COR-PCS-015 | R04 | Mesaieed Petrochemical | Noura Al-SulaitiVendor | Code C | ||
| Pipeline Welding Procedure | QE-WLD-WPS-042 | R01 | North Field East Phase 2 | Raj PatelVendor | Pending Review | ||
| Equipment Data Sheet - Pump | QE-MEC-EDS-019 | R02 | Al Khor Gas Processing | Layla HassanMadina | Code A |
Role-specific shortcuts for your most common workflow tasks
Vendor / GESDraft a new IFA/IFC document with title, number, and revision fields.
→Upload documents up to 50MB and get AI-generated summaries with discrepancy detection.
→Route completed documents to the Main Contractor for review and action.
→
No comments yet. Be the first!