offline-pos-proposal

byJanvi shah

Need a proposal for the below scope of work attached

Landing
Landing

Comments (0)

No comments yet. Be the first!

Project Tasks

44 planning tasks
#1

Generate system requirement document

0m 49s0.2 cr used
Done
#36

Generate system requirement document

0m 4s0.2 cr used
Paused
#2

Generate personas & user flows

0m 17s0.2 cr used
Done
#7

Create flow for Client Business Representative

0m 15sCredits in parent
Done
#8

Create flow for POC Reviewer

0m 14sCredits in parent
Done
#9

Create flow for POC Implementation Lead / Shared Technical Lead

0m 14sCredits in parent
Done
#10

Create flow for Android Developer

0m 14sCredits in parent
Done
#11

Create flow for QA / Evidence Reviewer

0m 14sCredits in parent
Done
#12

Create flow for Terminal Operator

0m 14sCredits in parent
Done
#37

Generate personas & user flows

0.2 cr used
Queued
#13

Landing

4m 56sCredits in subtasks
Done
#35

Fix Landing review findings: Q1 as reviewed now: The hero’s evidence panel is not a… (+2 more)

1m 37s0.4 cr used
Done
#26

Landing / Proposal Header

0m 23s0.75 cr used
Done
#27

Landing / Hero Split

0m 30s0.75 cr used
Done
#28

Landing / Scope Boundary

0m 30s0.75 cr used
Done
#29

Landing / Gate Index

0m 32s0.75 cr used
Done
#30

Landing / Evidence Deliverables

0m 37s0.75 cr used
Done
#31

Landing / Verdict

0m 28s0.75 cr used
Done
#32

Landing / Proposal Footer

0m 22s0.75 cr used
Done
#33

Proposal Header

0m 23sCredits in parent
Done
#34

Proposal Footer

0m 22sCredits in parent
Done
#38

Design first page

0.2 cr used
Queued
#14

Assessment

Credits in subtasks
Cancelled
#15

Provider Validation

Credits in subtasks
Cancelled
#16

Checkpoints

Credits in subtasks
Cancelled
#17

Integration Setup

Credits in subtasks
Cancelled
#18

Payment

Credits in subtasks
Cancelled
#19

Transactions

Credits in subtasks
Cancelled
#20

Recovery

Credits in subtasks
Cancelled
#21

Offline Tests

Credits in subtasks
Cancelled
#22

Receipts

Credits in subtasks
Cancelled
#23

Settlement

Credits in subtasks
Cancelled
#24

Findings

Credits in subtasks
Cancelled
#25

Handover

Credits in subtasks
Cancelled
#39

Design remaining pages

0.2 cr used
Queued
#5

Architecture

0.2 cr needed
Cancelled
#6

Workspace task plan

0.2 cr needed
Cancelled
#40

Update Android Developer flow

0m 12sCredits unavailable
Done
#41

Update Client Business Representative flow

0m 10sCredits unavailable
Done
#42

Update POC Implementation Lead / Shared Technical Lead flow

0m 5sCredits unavailable
Done
#43

Update POC Reviewer flow

0m 8sCredits unavailable
Done
#44

Update QA / Evidence Reviewer flow

0m 4sCredits unavailable
Done
#45

Update Terminal Operator flow

0m 6sCredits unavailable
Done
#46

Update Landing

3m 1sCredits unavailable
Error
Landing design preview
Landing: Review POC scope and parties
Integration Setup: Select compatible interface
Integration Setup: Register app and test credentials
Integration Setup: Configure one terminal
Integration Setup: Verify provider flow invocation
Integration Setup: Obtain approved test cards
Payment: Run app launch flow
Payment: Prevent repeated submission
Payment: Use idempotency references
Recovery: Test duplicate-tap control
Recovery: Recover with original reference
Recovery: Test supported reversal methods
Offline Tests: Test provider-managed capability
Offline Tests: Test reconnection behavior
Receipts: Test reprint via interface
Handover: Deliver source and build notes
Landing design preview
Landing: Review POC scope and parties
Integration Setup: Select compatible interface
Integration Setup: Register app and test credentials
Integration Setup: Configure one terminal
Integration Setup: Verify provider flow invocation
Integration Setup: Obtain approved test cards
Payment: Run app launch flow
Payment: Prevent repeated submission
Payment: Use idempotency references
Recovery: Test duplicate-tap control
Recovery: Recover with original reference
Recovery: Test supported reversal methods
Offline Tests: Test provider-managed capability
Offline Tests: Test reconnection behavior
Receipts: Test reprint via interface
Handover: Deliver source and build notes