
Master operations overview — triage incoming issues, assign technicians, and track resolution progress across all floors of the tower.
| ID | Location | Description | Reported By | Status | Priority | Technician | Reported | Updated | |
|---|---|---|---|---|---|---|---|---|---|
| ISS-1033 | Floor 9 · Corridor | Ceiling tile displaced — exposed wiring visible above walkway | Operations Desk | Assigned | Urgent | WLWei Ling | 4h ago | 1h ago | |
| ISS-1042 | Floor 12 · Suite 1204 | AC unit leaking water onto hallway carpet — tenant reports pooling near elevator lobby | Sarah Chen (Tenant) | New | Urgent | RPRaj Patel | 2h ago | 2h ago | |
| ISS-1037 | Floor 22 · Elevator Lobby | Elevator B making grinding noise during descent — safety concern flagged | David Koh (Tenant) | Assigned | Urgent | WLWei Ling | 16h ago | 2h ago | |
| ISS-1041 | Floor 4 · Lobby | Broken LED panel in main lobby — half the panel is flickering and unreadable | Marcus Tan (Staff) | Assigned | High | WLWei Ling | 2h ago | 1h ago | |
| ISS-1036 | Floor 6 · Suite 608 | Door handle on fire escape stairwell is loose — safety compliance risk | Operations Desk | In Progress | High | AFAhmad Fikri | 23h ago | 3h ago | |
| ISS-1035 | Floor 10 · Conference Room A | Projector HDMI port not detecting input — presentation scheduled for 2pm | Rachel Lim (Tenant) | New | High | Unassigned | 3h ago | 3h ago | |
| ISS-1040 | Floor 8 · Restroom B | Clogged sink drain in men's restroom — water backing up and slow to drain | Linda Ng (Tenant) | In Progress | Medium | AFAhmad Fikri | 20h ago | 1h ago | |
| ISS-1038 | Floor 3 · Pantry | Water dispenser not cooling — staff unable to get cold water since yesterday | Priya Sharma (Staff) | New | Medium | Unassigned | 3h ago | 3h ago | |
| ISS-1034 | Floor 18 · Suite 1802 | Window seal leaking during rain — water stains visible on interior wall | Michael Tan (Tenant) | Completed | Medium | RPRaj Patel | 3d ago | 1d ago | |
| ISS-1039 | Floor 15 · Suite 1501 | Flickering fluorescent tube in corridor — tenant says it causes headaches | James Wong (Tenant) | Completed | Low | RPRaj Patel | 1d ago | 18h ago |

Start reporting facility issues, tracking maintenance progress, and keeping your office tower running smoothly — all in one place.
Join Mercy-Facilities to report, track, and manage facility issues in your office tower.
Have an account?Sign in here
Signing up takes less than a minute and unlocks the full Mercy-Facilities experience for your team.
Already have an account? Sign in here
No comments yet. Be the first!