Output power degradation is impacting production throughput on Workstation Line 3. Estimated throughput loss:
Follow the step-by-step procedure below to resolve the identified issue. Complete all safety prerequisites before beginning any corrective action.
Diagnostic in progress — 0 of 5 steps completed.
Open the diagnostic panel and verify that all cavity mirrors show centered beam spots on the alignment targets. Misalignment beyond 0.5 mrad requires recalibration.
# Check alignment via diagnostic bus laserctl diag --mode=cavity --tolerance=0.5 # Expected: ALL_MIRRORS_ALIGNED # If FAIL: note the mirror index in the output
Confirm the Q-switch trigger delay matches the flashlamp pulse profile. Offset beyond ±2 µs can cause double-pulsing or energy instability.
# Read current Q-switch timing laserctl qswitch --get-delay # Adjust if needed (target: 285 µs for fundamental mode) laserctl qswitch --set-delay=285 --mode=fundamental
Run the power calibration routine with the reference head. Acceptable deviation is <3% across the 10-100% output range.
# Full power calibration sweep laserctl calib --sweep=10:100:10 --ref=head2 --output=/tmp/calib_$(date +%s).json # Validate results laserctl calib --validate --file=/tmp/calib_*.json
If the issue involves gas laser tubes, perform a full purge cycle followed by regulated refill to specification pressure.
# Purge cycle (3x) laserctl gas --purge --cycles=3 --confirm # Refill to spec laserctl gas --fill --pressure=4.2 --gas=MIX_1
Execute the full diagnostic suite. All subsystems must report green status before returning the laser to production.
# Full diagnostic suite laserctl diag --full --output=verbose # System health report laserctl health --format=json | jq '.subsystems[] | select(.status != "OK")'