My Tasks
Updated just now
3 Pending
3 In Progress
3 Completed
Pending
3Inspect Basement Moisture Levels
HighLakeside Residences
Procure Elastomeric Coating Materials
MediumSkyline Tower
Prepare Surface for Terrace Treatment
LowPalm Grove Villas
In Progress
3Apply Waterproof Membrane — Roof Level 3
HighSkyline Tower
Seal Expansion Joints — Basement B2
HighLakeside Residences
Install Drainage Layer — Pool Perimeter
MediumMetro Business Hub
Completed
3Site Survey & Blueprint Marking
MediumHeritage Mall
Upload Pre-Work Documentation
LowRiverside Apartments
Client Walkthrough — Terrace Coat
LowPalm Grove Villas
No comments yet. Be the first!