bronze-msarak

byأيمن مشاريع

https://github.com/Bito-Tech/msarak اطلع على هذا المشروع

No preview

Comments (0)

No comments yet. Be the first!

Project Tasks

16 planning tasks
#1

Generate system requirement document

2m 0s0.2 cr used
Done
#2

Generate personas & user flows

0m 9s0.2 cr used
Done
#7

Create flow for مطوّر الواجهات (UI/UX Developer)

0m 8sCredits in parent
Done
#8

Create flow for مالك المشروع / صاحب القرار

0m 8sCredits in parent
Done
#9

Landing

0m 38sCredits in subtasks
Paused
#17

Landing / Navigation

1.6 cr needed
Paused
#13

Landing / Hero

1.6 cr needed
Paused
#14

Landing / Scope And Roles

1.6 cr needed
Paused
#15

Landing / Repository Reference

1.6 cr needed
Paused
#16

Landing / Specialisations Ticker

1.6 cr needed
Paused
#18

Landing / Footer

1.6 cr needed
Paused
#10

Current UI

Credits in subtasks
Paused
#11

Design Workspace

Credits in subtasks
Paused
#12

Preview

Credits in subtasks
Paused
#5

Architecture

0.2 cr needed
Paused
#6

Workspace task plan

0.2 cr needed
Paused

No completed page designs yet.

Completed design pages will appear here when they are ready to preview.

Landing: Read scope statement
Landing: Read role descriptions
Landing: Enter workspace
Landing: Retry workspace entry
Design Workspace: Establish access
Design Workspace: 1. Review improvement items
Design Workspace: 2. Set improvement priority
Design Workspace: 3. Retry priority change
Preview: 4. Open developed interface
Preview: 5. Record verification outcome
Preview: 6. Return item to workspace
Design Workspace: Approve design
Design Workspace: Retry approval
Design Workspace: View confirmed state

No completed page designs yet.

Completed design pages will appear here when they are ready to preview.

Landing: Read scope statement
Landing: Read role descriptions
Landing: Enter workspace
Landing: Retry workspace entry
Design Workspace: Establish access
Design Workspace: 1. Review improvement items
Design Workspace: 2. Set improvement priority
Design Workspace: 3. Retry priority change
Preview: 4. Open developed interface
Preview: 5. Record verification outcome
Preview: 6. Return item to workspace
Design Workspace: Approve design
Design Workspace: Retry approval
Design Workspace: View confirmed state