
AI-powered conflict detection cross-matches extracted text callouts against your interface risk rules. Identified scope gaps are automatically injected into Supabase for review and resolution.
Drag and drop your architectural drawing PDFs or browse your files. Supports up to 50MB per file.
Drag architectural drawings into this area, or click to browse your local files
PDF only · Max 50 MB per file · Multiple files supported
| ID | Description | Severity | Status | Keywords | Rule | Expand |
|---|---|---|---|---|---|---|
| CONF-0041 | Structural beam load specification contradicts floor plan bearing wall removal — dual keyword match on load-bearing path. | Critical | Open | load-bearingbeam removalshear wall | IRR-STRUCT-007 | |
| CONF-0042 | Fire egress width listed as 32" in corridor detail conflicts with code-minimum 36" noted in egress plan legend. | Critical | Open | egress widthcorridorexit access | IRR-EGRESS-002 | |
| CONF-0043 | Mechanical ductwork routing overlaps with structural joist space in ceiling plenum — potential constructability conflict. | High | In Review | ductworkjoist clearanceplenum | IRR-MEP-011 | |
| CONF-0044 | Plumbing rough-in schedule calls for 4" drain line in a slab section designated as post-tension — penetration not permitted. | High | Open | post-tension slabpenetrationdrain rough-in | IRR-STRUCT-013 | |
| CONF-0045 | Window schedule specifies U-value 0.35 but energy compliance notes require U-value ≤ 0.28 per climate zone 4A. | Medium | Open | U-valuefenestrationclimate zone | IRR-ENERGY-004 | |
| CONF-0046 | Accessible parking stall count (4 stalls) is below ADA minimum for a 120-stall lot (requires 5 van-accessible stalls). | Medium | In Review | accessible parkingvan-accessibleADA Table 208.2 | IRR-ACCESS-001 | |
| CONF-0047 | Interior finish schedule lists Class C carpet in a corridor rated for Class B or better under NFPA 101. | Medium | Resolved | interior finishcorridorflame spread | IRR-FIRE-006 | |
| CONF-0048 | Electrical panel schedule shows 200A main breaker; load calculations in E-001 indicate 240A peak demand. | Low | Resolved | main breakerload calculationpanel schedule | IRR-ELEC-009 |
Structural beam load specification contradicts floor plan bearing wall removal — dual keyword match on load-bearing path.
Fire egress width listed as 32" in corridor detail conflicts with code-minimum 36" noted in egress plan legend.
Mechanical ductwork routing overlaps with structural joist space in ceiling plenum — potential constructability conflict.
Plumbing rough-in schedule calls for 4" drain line in a slab section designated as post-tension — penetration not permitted.
Window schedule specifies U-value 0.35 but energy compliance notes require U-value ≤ 0.28 per climate zone 4A.
Accessible parking stall count (4 stalls) is below ADA minimum for a 120-stall lot (requires 5 van-accessible stalls).
Interior finish schedule lists Class C carpet in a corridor rated for Class B or better under NFPA 101.
Electrical panel schedule shows 200A main breaker; load calculations in E-001 indicate 240A peak demand.
Detected conflicts are pinned directly on the architectural drawing. Click any marker to inspect the matched keywords, severity, and suggested resolution.

Detect scope gaps and conflicts instantly using AI-powered analysis. Upload your PDFs and get actionable insights in seconds, not hours.
From upload to report, instructSite automates the tedious work of cross-referencing architectural specifications and flagging conflicts.
Upload architectural drawings and watch AI-powered analysis detect interface conflicts in real-time. Rotate, zoom, and explore every detail in 3D.
instructSite turns complex architectural drawings into actionable conflict reports through a streamlined four-step process.
Drag and drop your architectural PDF drawings into the platform for instant processing.
Our AI engine extracts every text callout using advanced PDF parsing technology.
Extracted text is cross-referenced against your predefined rules to flag potential conflicts.
Identified scope gaps are logged with severity ratings so your team can resolve them quickly.
Testimonials
See how instructSite helps teams catch scope gaps, reduce rework, and streamline drawing analysis.
“instructSite caught 14 scope gaps in our hospital renovation drawings that we completely missed during manual review. The AI cross-matching against interface risk rules saved us weeks of back-and-forth with subcontractors.”
“We uploaded a 200-page commercial tower PDF set and had flagged conflicts within seconds. The keyword matching is incredibly precise — it identified clashing HVAC and structural callouts across different drawing sheets automatically.”
“The interactive blueprint explorer made reviewing scope gaps intuitive for our entire team. Being able to click conflict markers and see matched keywords in context transformed our quality assurance workflow.”
“instructSite caught 14 scope gaps in our hospital renovation drawings that we completely missed during manual review. The AI cross-matching against interface risk rules saved us weeks of back-and-forth with subcontractors.”
“We uploaded a 200-page commercial tower PDF set and had flagged conflicts within seconds. The keyword matching is incredibly precise — it identified clashing HVAC and structural callouts across different drawing sheets automatically.”
“The interactive blueprint explorer made reviewing scope gaps intuitive for our entire team. Being able to click conflict markers and see matched keywords in context transformed our quality assurance workflow.”
From solo architects to enterprise teams — choose the plan that fits your drawing analysis workflow.
Everything you need to know about instructSite and how it streamlines architectural drawing analysis.
Start analyzing architectural drawings in seconds. No credit card required.
Free 14-day trial. No credit card needed. Cancel anytime.
No comments yet. Be the first!